Privacy Policy

This site uses cookies to provide you with an optimal experience.  Learn more

Where would you like to share this page?

Town Planning

Sign


Please note:

  • Requests are analyzed on a first-come, first-served basis; 
  • Please allow 10 working days for a response; 
  • A delay of up to 60 days is required to obtain your permit;
  • That the analysis of the application, as well as the 60-day delay, begins only when the application submitted is declared valid and complete by the municipal officer; 
  • That an application received without the necessary documents and/or information will be declared incomplete and refused.


Applicant identification

Location of work

Are you the owner?

IMPORTANT: if you are not the owner, please attach a signed power of attorney from the owner(s) to the "Document Filing" section.

Who will carry out the work?

Enseigne

Type
Sign
The permit fee is $120. The fee for renewing a permit is set at 50% of the initial cost.

Posting Regulations Chapter 6
https://www.chelsea.ca/application/files/7617/1415/2648/07_1287-23_modifiant_1215-22_compressed.pdf

Don’t forget to submit both your PIIA application and your business permit application simultaneously.

Processing Time: The review of a PIIA (Site Planning and Architectural Integration) application takes approximately 2 to 4 months from the time a complete application is submitted.
Detailed color sketch of the proposed sign (front and side views), including the following information:
Dimensions of the sign (height, width, and thickness)
Distance between the sign and the ground level
Description of the sign’s structure and mounting method
Materials used for the sign, its structure, and mounting method
Type of lighting
Documents and information for signs on buildings:

Location of the sign on the building (photo, sketch, or drawing of the installation)
Clearance below the sign (for brackets and projection only)
Documents and information for signs on premises:

Location plan (e.g., recent property survey) including the following information:
Distance between the sign and property lines
Distance between the sign and the building